The installation steps of the mixing blade of the sewage treatment mixer are as follows:
First. Preliminary preparation
1. Check the size of the mixing blade and the mixing equipment to ensure that they meet the installation requirements.
2. Prepare required tools and materials, such as wrenches, screwdrivers, and gaskets.
Second, installation steps
1. Secure the reducer support to the connecting bottom plate, and place it on the preset base piece to ensure that the installation Angle is correct.
2. If the flange through hole on the tank or pool wall is smaller than the outer diameter of the mixing blade, the mixing blade should be removed first, and then installed after the main engine is installed.
3. Install and fix the mixing paddle in the tank or tank. If the device is equipped with a fairing, it also needs to be installed in this step.
4. Properly tighten the coupling and the bolts and nuts of each part to ensure that the mixing blade is fixed firmly.
Third, debugging and inspection
1. Manually rotate the stirring blade to ensure that its rotating shaft rotates flexibly without stuck phenomenon.
2. Check all fasteners to ensure they are firmly tightened.
3. Conduct trial operation to observe the operation of the mixing blade to ensure its normal operation.
Fourth. Precautions
1. During the installation process, strictly follow the safety operation rules to avoid accidental injuries.
2. Ensure that the power supply is completely cut off before you install or maintain the device.
3. If you encounter any problems during the installation process, stop the operation immediately and seek professional help.
Through the above steps, you can ensure that the mixing blade of the sewage treatment mixer can be correctly and safely installed. Please note that these steps may vary depending on the device and site conditions, so refer to the installation instructions of the device and follow the relevant safety regulations.